Cart
Cart

YEM021GC RS485 and infrared 3 Phase 4 Wire Din Rail Energy Meter/AMR Electric Digital Power Meter

 
 
Price: 21.68Dollar/Piece
Min quantity: 1 Piece
Quantity: 999 Piece
Deliver: In 7 days
Area: China
Expiry: Long-term
Edit time: 2023-01-04 17:29
Hits: 236
 
Company integrity file
more>New Products
Good price YEM313 single-phase digital display electricity meter Energy Meter NEW Type Single Phase Modbus 100A Energy Meter Smart Electric Meters 17.5mm width Single Phase Watt Hour Meter for Energy Monitor 127V/230V 5(30)A single phase two wire din rail active kwh meter with pulse output Manufacturer YEM313 Smart Single-phase Energy Meter New type single phase din rail analog active energy meter with step motor type impulse register
Detail

Overview

Essential details

Supply Ability

Packaging & delivery

YEM021GC RS485 and infrared 3 Phase 4 Wire Din Rail Energy Meter/AMR Electric Digital Power Meter

Product Description

YEM021GC RS485 and infrared 3 Phase 4 Wire Din Rail Energy Meter/AMR Electric Digital Power MeterYEM021GC RS485 and infrared 3 Phase 4 Wire Din Rail Energy Meter/AMR Electric Digital Power Meter

Technical Parameters

 

Model AccuracyCommunicatinDimension 
Connection Mode
YEM021GC
1.0RS485, infrared
88x125x73mmDirectly/ CT/ CT&PT
Rated VoltageRated Current Starting CurrentDisplay ModeInsulation Performance
 3x127V/220V, 3x230V/400V
5(30)A ,10(60)A,  20(100)A    0.02A, 0.04A,  0.08A LCD 6+1
        AC voltage 4kv             for 1 minute,1.2/50us wavefrom  impulse voltage 6kv

Dimension

  YEM021GC RS485 and infrared 3 Phase 4 Wire Din Rail Energy Meter/AMR Electric Digital Power MeterYEM021GC RS485 and infrared 3 Phase 4 Wire Din Rail Energy Meter/AMR Electric Digital Power Meter

 

1 Where is your factory?

Our factory is located in Qiaoqian Industry Area, Liushi Town, Yueqing City, Zhejiang Province, 325603 China.

2 Are you manufacturer or business?

We are manufacturer established in 2002, and have over 16 years production experience.

3. Can I ask for samples?

Yes 

4. What's the warranty of your products?

18 months

5. What's the lead time?

Depend on the quantity and model of the order, normally it takes around 2-3 days, but the exact lead time should be discussed  with our sales.

6. How about the MOQ, Payment term, Delivery port, and shipping date?

1)MOQ: 100 pcs/item based on existing packing.

2)T/T-30% deposit and 70% against copy of BL

3)L/C is also acceptable

4)Ningbo/Shanghai

 


Report 0 Favorite 0 Comment 0
more>Related
KYN28-12 Medium voltage MV electrical Switch gear for power distribution High voltage energy saving panel with automatic power factor correction high voltage KYN28-12 Switchgear main electrical switch board for indoor substation equipment AC type surge protector SPD Surge Protective Device 100ka Intelligent Motor Protector intelligent Reactive power compensation controller automatic power factor controller